A lot has been happening on our construction site in recent weeks. Our new depot is being built on an impressive 20,000 square meters, including a production area of 3,000 square meters for residential containers – versatile solutions for the future will soon be created here.
A brief update on what we have achieved so far:
- Asphalting the rest of the site
- Laying the floor in the hall
- Pipe construction on the gate building, including clinker brick work
- Expansion of the small parts warehouse, including stairs and railings for the roof
- Interior work in the hall and administration building (electrics, drywall, etc.)
- Preparation of showers, water pipes and underfloor heating
- Installation of a huge extinguishing water tank on the outside area
- Construction of a carport for assembly vehicles and trailers